"..Your first choice in geotechnical engineering solutions.."     

Tel +44 (0) 1744 818009      

Home   |   Company Profile   |   Products   |   News     

 
 
 
 
 Restricted Access Piling

In restricted access situations, difficult ground conditions and where heavy equipment cannot be used, we can provide the choice of auger bored, CFA, drilled rock socket or driven piling systems. Piles can be constructed to carry effectively high working loads. For instance, given the right ground conditions, a 200mm diameter pile with appropriate reinforcement can carry a working load in the order of 800kN. Provision can be made for shear and bending forces by using cage or CHS reinforcement.

 
Capabilities
  • Piles in soft soils, obstructed ground and rock.
  • Bearing piles and piled retaining walls.
  • Diameters from 100mm to 600mm.
  • Axial capacities up to 2500 kN, according to ground conditions.
  • Headroom as low as 2.2m.
  • Silent, electric powered rigs.

 Applications

  • Noise and vibration and weight susceptible sites.
  • Restricted access and/or headroom sites.
  • Working inside operating stores and factories.
  • Piling on archaeologically sensitive sites.

Click to download PDF Contract Information

Restricted Access Piling Case Studies
Auger Bored Piling    
ASDA Store, Sheffield May 2003 187Kb
Frankwell Flood Alleviation Scheme, Shrewsbury March/April 2003 289Kb
CTRL 250 A13 Alfred's Way Bridge, Dagenham Dec 2002 295Kb
European Weather Centre, Reading September 2001 104Kb
Whitby Abbey, Whitby, North Yorkshire July 2000 233Kb
Drilled Rock Socket    
Belmont WwTW, Bolton May 2004 127Kb
Deeside to Daines OHL Summer 2003 132Kb
Liverpool WwTW, Sandon Dock Phase 3 January 2004 220Kb
Fearn Island Mills, Leeds Nov 2003 106Kb
Franklaw WTW, Catterall, Preston December 2002 82Kb
Cossall Footbridge 93 (TCC), Ilkeston, Derbyshire Oct / Nov 2002 79Kb
South Birmingham College Redevelopment, Digbeth October 2002 85Kb
MMU Tower Crane, Manchester July 2002 82Kb
Derby STW May 2002 64Kb
United Utilities - Liverpool WwTW, Sandon Dock January 2002 99Kb
Gomersal Park Hotel, Cleckheaton October 2001 109Kb
The Brewhouse & Tower, Bristol Summer 2001 96Kb
Forge Lane, Oughtibridge Summer 2001 140Kb
David Lloyd Racquets & Fitness Club, West Bridgford, Nottingham January 2001 80Kb
Driven Piling    
Bury TLS February 2004 161Kb
Middleton Pumping facility, Heysham January 2004 140Kb

Please contact us now to discuss how Systems Geotechnique can help on your project - TEL. 01744 818009

© Systems Geotechnique Ltd 1999- - Enquiries@systems-geotechnique.co.uk

TERMS OF USE